Commissioning generally means booting up the generator system, which needs to be tested to make sure that it works as it was designed to. Generators feature complex mechanics and there are certain components that have to be checked prior to the boot-up in order for the system to be ready for commissioning. Once all components have been verified, typically the boot-up should run smoothly and will not require additional trips.