Case Study
We have worked with a number of clients working in offshore and renewable power, wind power and more. Recently, a client approached us needing new UPS systems for both their offshore platforms and their onshore substations for a brand new offshore wind farm energy and power project. They needed to secure these stations with a reliable UPS that would ensure minimal downtime for wind power capable of supplying clean energy to more than one million households.
Our client needed Dale's reliable UPS systems installing in a range of different locations, alongside other services:
Two offshore UPS systems and one offshore UPS system for their Scottish platform.
Three offshore UPS systems and one offshore UPS system for the North Norfolk offshore site.
Compact stainless steel enclosures were designed to house the DCV Thyristor offshore UPS systems.
Standard enclosures housed AC DC 6CV Thyristor onshore.
Renewable energy for over a million homes
UPS systems were shipped to Belgium, installed on the platform which was then floated into position
Within a week of factory acceptance the UPS systems were on site ready to be installed on the Platforms