Case Study
Our client, a large public sector local authority in London, had a closed loop protocol UPS system. When they came to renew the servicing and maintenance contract, they realised that the closed protocol system locked them into an extremely expensive servicing and maintenance contract with their existing supplier.
• Flexibility and control were core to the delivery when considering not only servicing package but also the product
• The Dale E600 allowed the client to configure loads from 20-600kVA as well as having power autonomy that could be added to suit their requirements
• The sophisticated design of the UPS system enables maintenance work to be carried out without disruption to power supply, this was ideal for the client who cannot have any disturbance to power supply
Sophisticated modular design with excellent operational resilience
3:3 Phase, 20-600kVA, 0.9PF
No disruption to power when maintenance work is being carried out
Expandable system. The power solution can grow to meet expanding power requirements