North West Anglia Trust needed to replace critical power equipment supporting the main data centre at Hinchingbrooke Hospital, in Huntingdon. The equipment was reaching its end of life and in an environment supporting all the hospitals clinical work, power failure is not an option, so selecting the right partner for the project was crucial. This was a complex installation as the new equipment had to fit with existing infrastructure.
Working with the installation team, Dale project managers designed the solution which included laying 100 metres of cabling encased in specialist trunking across the hospital roof
The switchover took place over a weekend when the operating theatres and clinics were not in use
A 30kVA modular UPS with an active on-line redundancy of a further 20kVA was installed which ensures no break power support in the short term with the ability for a generator connection during a prevailing power outage.
30kVA UPS with 20kVA built in redundancy
Complex installation with minimal site issues completed with full customer support and satisfaction
Service and support package to meet all hospital requirements