Custom built control panels extend the life of generators for London traders
Case Study
Our London client, in the financial services and asset management sector, had two standby generators with switchgear that was no longer supported and components that were no longer available. Any power failure could be costly to their financial trading floors. The electrical engineering company contracted to support the building called on Dale Power Solutions for assistance.
Dale recommended replacing the control systems. An intensive survey was carried out to ensure that all replacement parts would be an exact fit to accommodate existing cabling
Dale carried out a health and safety risk assessment to comply with the building’s strict regulations
Sophisticated control panels were designed and engineered to match the functionality of the original generators
New control panels were designed and fitted with circuit breaker connectors
LCD panels replaced the push button originals
A cost-effective solution extending the life of two standby generators
The new control panels provided the client with improved generator diagnostics
New equipment was fitted over two bank holiday weekends to avoid interruption to business and completed within a very tight timeframe
A further order was placed for routine service and maintenance and the modification of a bulk fuel tank
“The engineers completed the work with very little time available. We now have a guaranteed life for the equipment and knowledge of its history which we did not have before.”